Home | About Novator | Technology & Products | News | Contact | Service and Support |
The Orbital Drilling Concept
Reduced lead time and production costs
More holes with each tool
Facilitates use of new materials
Excellent hole quality
Improved working environment
Published litterature on Orbital Drilling

 

Products & Services
Orbital Drilling Center
Customer Examples
 

Simplified assembly process with Orbital Drilling

The total production lead times are often drastically reduced with Orbital Drilling since the assembly can be performed in one operation. In an assembly process using conventional drilling you have to go through several time consuming steps including disassembly and reassembling for deburring, separate reaming and cleaning of coolants.

 

Below is a comparison of a conventional drilling process and a process using Orbital Drilling. The comparison is collected from the publication "Drilling Cost Model" produced by Society of Automotive Engineers, Inc.

 

 

Conventional Drilling

 

Orbital Drilling

 

 

     

   

Managed by WebDoc